Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Amazing unique Rolls-Royce headed to auction

Fri, 25 Apr 2014

ROLLS-ROYCE fanatics should start warming up their cheque books, as news has emerged that the very first Corniche ever made is about to head to auction. Chassis number 001, built in 2000, is not just the first of its model, though. It was the first example of the very last model to be made in Crewe, at the firm's former facility and under independent ownership.

The Moke is back, baby!

Fri, 11 Oct 2013

The past two days have been quite an emotional roller coaster. First, we were crushed to hear that the end of the line is fast approaching for the rugged, beloved Land Rover Defender. Next thing we know, we're reading about the resumption of Moke production in China over at Hemmings and everything is sunshine and rainbows once again.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.